Process to New Bathroom
Process to New Bathroom
Process how to change your Old Bathroom to Modern New Bathroom and beautiful room for your every day life.
Old Bathroom before start work.
Old Bathroom before start work.
First step include removing the bath, basin, toilet, radiator and tiles from floor - walls to the skip.​
First step include removing the bath, basin, toilet, radiator and tiles from floor - walls to the skip.​
Second step is Plumbing work.
Changing the pipes from floor to wall for radiator, toilet, basin and shower.
Second step is Plumbing work.
Changing the pipes from floor to wall for radiator, toilet, basin and shower.
Third step is preparation walls and floor for tiling.
Plaster-moisture board fitted on the wall and in bath - shower area Waterproof tanking need to be done.
Third step is preparation walls and floor for tiling.
Plaster-moisture board fitted on the wall and in bath - shower area Waterproof tanking need to be done.
Floor need to be made solid and covered with mat.
Ceiling painting and installing IP 65 bathroom spot down light.
Floor need to be made solid and covered with mat.
Ceiling painting and installing IP 65 bathroom spot down light.
Fourt step is tailing - grouting floor and walls.
Fourt step is tailing - grouting floor and walls.
New Bathroom after fitted thermostatic valve shower system, shower bath screen, LED mirror with sensor, basin drawer unit, toilet, radiator and painted door.
New Bathroom after fitted thermostatic valve shower system, shower bath screen, LED mirror with sensor, basin drawer unit, toilet, radiator and painted door.